    What is Overall Equipment/Machine Efficiency (OEE):
     
    OEE is the framework for measuring the efficiency and effectiveness of a process, by breaking it down into three constituent components (Availability, Performance and Quality product rate). It helps to measure a problem so that easily can fix it and provides a standardized method of benchmarking progress. OEE identifies the percentage of planned production time that is truly productive. 
    Overall Machine Efficiency

    Overall machine or equipment efficiency is the how to performs machine versus spec. In practically, 

    OEE= Availability X Performance Rate X Quality Product Rate 


    Where,

                          Loading time – Down time
    Availability = ………………………………………. X 100
                                  Loading time 


                             Standard cycle time x Processing quantity
    Performance = …………………………………………………. x 100
                                                  Operating time 


                                         Processing quantity – Defective quantity 
    Quality product rate = ……………………………………………………………. X 100
                                                       Processing quantity 

    Let,
    • Working hours per day: 10 hours x 60 min = 600 min
    • Shut down (SD): 35 min
    • Loading time: (600-35) = 565 min
    • Equipment stoppage/ down time: (30+20+25) = 75
    (a) Failure : 30 min 
    (b) Set up : 20 min 
    (c) Adjustment : 25 min 

    • Operating time : (565 - 75) = 490 min
    • Standard Cycle time : 0.35 min/ pieces
    • Processing quantity : 550 pieces/ day
    • Defective : 30 pieces.
    Now,

                           Loading time – Down time
    Availability = ……………………………………………. X 100
                                   Loading time 

        565 – 75
    ………………….. x 100
           565 

    = 86.72% 

                             Standard cycle time x Processing quantity
    Performance = ………………………………………………….. x 100
                                               Operating time 

        0.35 x 550
    ……………………. X 100
            490 

    = 40.35% 

                                          Processing quantity – Defective quantity 
    Quality product rate = ……………………………………………………………………. X 100
                                                     Processing quantity 

       550 – 30
    = …………….. x 100
         550 

    = 94.54% 

    So, OEE = Availability X Performance Rate X Quality Product Rate 

    = 0.8672 X 0.4035 X 0.9454 

    = 33.08% 

    Low Machine efficiency rate due to man: 

    1. Management Losses;
    2. Motion Losses;
    3. Adjustment Losses;
    4. Losses resulting from lack of automation and
    5. Monitoring Losses

    More articles of this writer:
    1. Industrial Engineering Formulas for Textile Students and Professionals
    2. Line Balance and Bottleneck in Garments Production Line
    3. Introductory of Inspection in Garments Industries

    No comments

    Post Top Ad

    ad728

    Post Bottom Ad

    ad728